|

Construction
Notifications
Advisories:
6/16/08 - Please
be advised that the asbestos abatement was completed over the
weekend and Ogren Construction has resumed their construction
activities on the
project today.
Normal activities may resume in the ASL and computer labs.
However, please be reminded that the Academic Building is still under
construction and no one should attempt to enter the building during the
period of construction.
Older Updates:
6/11/08 - Please
be advised that the final phase of asbestos abatement for the
Academic Building Renovation Project will begin tomorrow, Thursday,
June 12, 2008, at approximately 3:00 p.m. It should be completed
by
Monday morning, June 16.
NO ONE IS PERMITTED IN THE BUILDING DURING THE PERIOD OF
ABATEMENT,
WITHOUT EXCEPTION -- THIS INCLUDES EMPLOYEES, STUDENTS, SECURITY,
GENERAL PUBLIC, OR GENERAL CONSTRUCTION WORKERS.
Please be reminded that although no asbestos abatement will be taking
place in ASL or the Computer Labs connected to the main Academic
Building, no one is permitted in those areas during this period, at any
time, without exception.
We will send an all campus notice out Monday morning clearing the
building for occupancy.
If you have any questions, please call extension 400.
5/20/08 - Please
be advised that the second phase of the asbestos abatement on
the Academic Building renovation will begin some time early tomorrow
morning, Wednesday, May 21, and will continue for a period of two to
three weeks.
NO ONE, INCLUDING COLLEGE PERSONNEL, STUDENTS, OR
VISITORS, WITHOUT
EXCEPTION, SHALL BE PERMITTED IN THE ACADEMIC BUILDING AFTER 4:30 P.M.
TODAY, TUESDAY, MAY 20.
Only authorized construction personnel will be permitted in the
building during this time period.
We will notify everyone when the asbestos abatement has been completed,
and we have been issued a Certificate of Occupancy for the abatement
portion of the project.
5/7/08 - The
Academic Building renovation is proceeding quite well on the second
floor and is, in fact, slightly ahead of schedule. As with any
construction project, particularly one which involves such extensive
renovations, it has been necessary to alter and adjust the construction
schedule in response to unknown or unforeseen building conditions
throughout the process. However, we believe we are at a point in
the project where we have a degree of confidence that no further major
scheduling changes will be necessary. I would like to share the
following important dates with you.
- For those of you who are vacating the Academic Building for the
summer, please be reminded that your office should be packed and ready
to go no later than Wednesday, May 14. If you need any assistance
or supplies to accomplish this goal, please let me know as soon as
possible.
- College personnel will be removing all remaining furnishings on the
first floor on Friday, May 16, Monday, May 19, and Tuesday, May 20.
- Second-floor asbestos abatement is scheduled to begin on Wednesday,
May 21, and be completed on or before Wednesday, May 28.
- Asbestos removal on the first floor is scheduled to commence on
Wednesday, May 28, and be finished on or before Wednesday, June 4.
- There will be a major electrical shut down on Thursday, June 5,
Friday, June 6, and, if required, Saturday, June 7, and Sunday, June
8. This shut down will affect the Academic Building and
Library/Distance Learning Center. This shut down is required to
facilitate the electrical distribution upgrade to and within the
Academic Building, and to replace the electrical feed lines to the
Library/DLC. All power should return to normal on or before
Monday, June 9.
- The ASL wing will be closed Thursday and Friday, June 5 and 6, for
the replacement of the two rooftop air conditioning units.
I will update this schedule some time during the first week or
June. Once again, thank you to everyone for their patience during
this renovation. If you have any questions or need anything at
all, please do not hesitate to call me.
- Tony
At this time, please be reminded, and remind your students, that the
second floor of the Academic Building is closed daily from 6:00 a.m. to
4:00 p.m.
Thank you for your continued patience and
cooperation.
|
Projects
currently out to bid or under construction:
to be updated
|
Engineering
and/or architectural
services have been contracted for
the
following
projects,
and are
in various design stages:
to be updated
|
|